Healthcare · Boynton Beach, Florida

Baptist Health Bethesda — Central Energy Plant & Hospital Infrastructure

Key personnel experience across nine projects at an active hospital — including a 7.5 MW generation plant — without interrupting care.

Project overview

Large standby generator inside a hospital energy plant

Our key personnel have supported nine projects at Baptist Health Bethesda, including the design of a 7.5 MW parallel generation system: three 2.5 MW generators, 4000 A paralleling switchgear, and medium-voltage service coordination with FPL.

The replacement was phased so the hospital — serving 230+ patients daily — kept continuous life-safety power and operations throughout implementation.

Highlights

  • 7.5 MW plant with three 2.5 MW generators
  • 4000 A paralleling switchgear
  • Phased work in an operating hospital